Laserfiche WebLink
College Park at Monutain House Spedflc Plan III <br /> Mitigadon Monitoring and Reporft Program <br /> Implementation&Veriitcation <br /> Mkigation Measure Timing/Schedule <br /> Implementation <br /> Date <br /> Responsibility Action Completed <br /> �• shall be reviewed and approved by CDE,DTSC, <br /> the SJCCDD,and the Lammersville School <br /> District..Lf these agencies;determine,based on the <br /> PBA,that the school site does not meet CDE <br /> siting wq�iremeatr,the proposed school shalt be <br /> developed'at a different location within the:: <br /> College Park site,subje4 to clearance by a new <br /> PEA to be finn*d by the developers`If the new <br /> school site is required,.tbe devcl*n shall be <br /> responsible for processing the requpaed <br /> amendment to the.College Park Specific-Plan.III <br /> and obtaxvigig-and dedicating the new school site <br /> u, to the school distract.The assessment and analysis <br /> would be conducted in accordance with CDB <br /> reoftemenis'and would be under separate CEQA <br /> documentation. <br /> 4.9-5 Public$edth.and Safety—Ezpoenre to Pipeline During design phase SJCCDD,in <br /> Hazards conjunction with the . <br /> The following measut es shall be implemented by the developer <br /> o College Park developers: . <br /> < No habitable residential structures(Le.,homes, <br /> apartments,granny flats,garages converted to <br /> living quarters,patio rooms,sun rooms)shall be <br /> ca permitted within 68 feet of the PG& -Chevron <br /> papeline`that bisects the College Park site and. <br /> contains Pipelines L401,1002,and'CSDF 0499. <br /> m Alternatively,no habitable residential structures <br /> a as defined above shall be permitted within 68 <br /> feet of the nearest pipeline in the PG&E <br /> 44.1 easement.Outdoor.structures such as pools, <br /> M fences,patios,and decks could be allowed within <br /> y the no build zone,since occupancy would be less <br /> . than 100%.Garages would be permitted as long <br />