Laserfiche WebLink
W n <br /> n� o <br /> o College Park at Mountain House Specific Plan III <br /> CD <br /> -0 Mitigation Monitoring and Reporting Program <br /> W <br /> ImplementaEion-&Verification :: <br /> nv Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Completed <br /> � c <br /> for Protection of the San Joaquin Kit Fox before <br /> _ or during Ground Disturbance(US Fish and <br /> Wildlife Service [FWS] 1999b) shall apply <br /> CD (except that pre-construction survey protocols <br /> n shall remain as established in the above <br /> CD paragraph).These standards include provisions for ,. <br /> 0 educating construction workers regarding the kit <br /> v fox,keeping heavy equipment operating at safe <br /> speeds, checking construction pipes for kit fox <br /> occupation during construction, and similar low- <br /> or no-cost activities. <br /> 4.10-10 Biological Resources--Loss or Alteration of Before construction SJCOG,in <br /> w Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently DFG,USAGE and/or <br /> mitigated by participation in the SJMSCP,Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> o' the College Park project,a formal Section 404 <br /> delineation of waters of the United States, <br /> oincluding wetlands,shall be conducted by a <br /> o' qualified biologist in the Tentative Map or <br /> development project area if the area includes - <br /> v features that are potentially subject to United <br /> States Army Corp of Engineers(USACE) <br /> jurisdiction(ponds, irrigation canals, and <br /> CD <br /> o drainages).The delineation shall be submitted to <br /> USACE for verification. <br /> < If,based on the verified delineation, it is <br /> o m determined that till of waters of the United States <br /> i;), n o would result from the Tentative Map or <br /> 3 development project,authorization for such fill <br />