Laserfiche WebLink
P <br /> � (7 <br /> � O <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Ven ica ion. <br /> Implementation <br /> Mitigation Measure TiminglSchedule Responsibility Action <br /> Completed <br /> o <br /> qualified biologist and DFG determine it would <br /> z <br /> not be likely to adversely affect the nest. <br /> o Monitoring of the nest by a qualified biologist <br /> CD may be required if the activity has potential <br /> Cn adversely affect the nest. <br /> San Joaquin Kit Fox <br /> Before construction SJCOG,in <br /> < To minimize the potential for destruction of an (surveys to be consultation with <br /> moccupied burrow and direct take of a kit fox,a completed no more USFWS and DFG <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> or construction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas.Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> Standardized Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groun <br /> a-' Disturbance(USFWS 1999). <br /> o' <br /> < If no active dens are found during the surveys,a <br /> o letter report documenting the survey methodology <br /> o' and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> `Q before the start of ground disturbance or <br /> a <br /> consiruction activity.,and no further mitigation <br /> shall be necessary. <br /> o < Any known or potential dens discovered within <br /> a the survey area shall be monitored for 3 days to <br /> determine its current use. If no activity is observe <br /> 3M during this period,the den shall be destroyed <br /> W 11, immediately to preclude subsequent use. If kit fox <br /> activity is observed,the den shall be monitored fo <br />