Laserfiche WebLink
the den is a natal.den, a buffer zone of 250 feet shall be.maintained around,the den until the biologist <br /> determines that the den has been vacated. . <br /> Where San Joaquin kit fox are identified, the,provisions of the Standardized.Recommendations for <br /> Profection.of fhe'San Joaquin Kit Fox before.or during,Ground Disturbance(USFVIIS 1999b}shall <br /> apply(except that pre-construction survey protocols shall reel main.as established in the above <br /> paragraph). These standards include provisions for educating construction workers regarding the kit <br /> fox, keeping heavy equipment operating at safe'speeds; checking construction pipes for kit fox <br /> occupation during construction,.and similar low-or no-cost activities. (MM 4.10-9) <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San Joaquin <br /> County Community Development Department(CDD) prior to the issuance of grading permits for the <br /> project. <br /> 34. Biological Resources effects from Off-Site Infrastructure Improvements: <br /> For those off-site improvements proposed in San Joaquin County, the developer shall implement <br /> Mitigation Measures 4.10-5, 4.10-6, 4.10-7,4.10-9, and 4.10-10. <br /> 35. Endangered Species Act: In carrying out the operations of the Tentative Map, the applicant shall <br /> take no action that violates the California Endangered Species Act or the Federal Endangered <br /> Species Act. Compliance with said laws shall be the sole responsibility of the applicant and the <br /> applicant agrees to indemnify, defend and hold the County harmless from and against any claim or <br /> action by affected State agencies, or affected Federal agencies or other third party, as to the project's <br /> compliance with said laws. <br /> Timing: Improvement Pians prior to Final Maps and ongoing. <br /> AIR QUALITY <br /> 36. Air Impact Assessment Application: The developer shall provide confirmation to CDD that it has <br /> obtained approval of the Air Impact Assessment application for the Final Map from the San Joaquin <br /> Valley Air Pollution Control District. <br /> Timing: Prior to Final Maps, <br /> 37. Construction Emissions: Implement the latest version of the San Joaquin Valley Air Pollution <br /> Control District("SJVAPCD") construction-emissions control measures during construction. [MM 4.12- <br /> 1) <br /> Timing: Timing: Inclusion of a note specifying the construction-emission control measures on <br /> Improvement Plans. <br /> 38. Long Term Regional Emissions: Implement all of the mitigation measures as recommended in the <br /> Guide for Assessing and Mitigating Air Quality Impacts (SJVAPCD 1998). (MM 4.12-5) <br /> Timing: Inclusion of a note of the applicable mitigation measures on Improvement Plans. <br /> 39. Residential Emissions: Construction plans for residential dwellings shall incorporate the following <br /> items.- <br /> a. <br /> tems:a. Natural gas lines outlets shall be provided to backyards to encourage usage of natural gas <br /> barbecues. <br /> i <br /> Conditions of Approval _ 10 - PA-0700093 <br />