Laserfiche WebLink
rn <br /> ca' <br /> o' College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0_ Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Date <br /> Responsibility Action Completed <br /> CIL 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD, in <br /> Remains conjunction with the <br /> In accordance with the California Health and Safety developer, and in <br /> Code, if human remains are uncovered during conjunction with <br /> construction at the project site,the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed. <br /> SJCCDD.The County shall, in turn, immediately <br /> notify the San Joaquin County coroner of the find. The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> a-) 7050.5{b]). If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> C) determination(HSC Section 7050[c]), Once a Most <br /> 0 <br /> cn Likely Descendent(MLD) has been designated by the <br /> CD NAHC,the MLD, in consultation with the County, <br /> shall determine the ultimate disposition of the remains, <br /> 'r The responsibilities of the County for acting upon <br /> v <br /> notification of a discovery of Native American human <br /> c remains are outlined in detail in the PRC Section <br /> 5097.9. Measures likely resulting from the above <br /> could include preservation in place and V� <br /> ccapping/avoidance,or removal and continued <br /> monitoring of ground-disturbing activities, <br /> o 4.7 DRAINAGE <br /> c CD 0. 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD, in <br /> Capacity of the Storm-drain System conjunction with the <br /> C-) <br /> The College Park developers shall expand WQB1 as developer <br /> required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br />