Laserfiche WebLink
M <br /> ^: a <br /> o College Park at Mountain House Specific Plan Illi <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Date <br /> Action Completed <br /> maintenance responsibilities; <br /> m < Specify the pollutants that are likely to be used <br /> o during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> u, discharges; <br /> cB < Specify BMP inspection protocols to ensure that <br /> � the BMPs are effective and ensure that the <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> O0 measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> CD <br /> < Identify measures to prevent or clean up spills of <br /> CD <br /> _U hazardous materials used for equipment <br /> W operation and hazardous waste; <br /> Pr <br /> m < Identify emergency procedures for responding to <br /> o spills; <br /> C__ < Identify BMPs that shall be used in all <br /> su subsequent site-development activities; <br /> -7 < Identify personnel training requirements and <br /> m c procedures that will be used to ensure that <br /> m workers are aware of permit requirements and <br /> no`s a proper installation and performance inspection <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> csupervisory duties related to implementation of <br /> the SWPPP;and <br /> ` < Require all construction contractors to retain a <br />