My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006529
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
19530
>
2600 - Land Use Program
>
PA-0700093
>
SU0006529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:29 AM
Creation date
9/5/2019 10:46:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006529
PE
2611
FACILITY_NAME
PA-0700093
STREET_NUMBER
19530
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
APN
20907023
ENTERED_DATE
4/18/2007 12:00:00 AM
SITE_LOCATION
19530 W GRANT LINE RD
RECEIVED_DATE
4/18/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\APPL.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\CDD OK.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\EH COND.PDF \MIGRATIONS\G\GRANT LINE\19530\PA-0700093\SU0006529\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rn n <br /> as o <br /> Z:3 <br /> CD <br /> CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&.Verification <br /> j Mitigation Measure Timing/Schedule Responsibility Date <br /> P Y Action Completed <br /> Health Department shall identify"no further <br /> o actions required"before project construction <br /> C access at these locations. <br /> Cn <br /> CD < Phase I Environmental Site Assessment(ESAs) <br /> Cn <br /> shall be prepared by qualified hazardous materials <br /> CD <br /> experts for areas in Grant Line Village that are the <br /> subject of future development proposals before <br /> vconstruction in these areas.The ESAs shall be <br /> reviewed and approved by the County <br /> Environmental Health Department.Any <br /> recommendations made in the ESAs(monitoring, <br /> Phase II testing, mitigation, etc.)shall be <br /> s implemented. <br /> < Project grading, excavation, and other earth- <br /> moving activities directly adjacent to the off-site <br /> parcel where the December 4, 2003 crude oil <br /> release took place shall not occur until it has been <br /> verified,either by the assessment currently being <br /> �n conducted by the RWQCB or separate soil and <br /> a' groundwater sampling commissioned by the <br /> o" <br /> College Park developers,that the contamination <br /> o associated with the incident has not migrated to <br /> the College Park site. If the contamination has <br /> migrated to the College Park site, it shall be fully <br /> remediated to the satisfaction of the County <br /> a Environmental Health Department before project <br /> construction activities in the contaminated area. <br /> cn <br /> < Project construction activities at hazardous <br /> materials sites#3 and 7(identified in Figure 4.9-2 <br /> and Table 4.9-1 of the EIR) shall occur only after <br /> E3 m any contamination that may exist at these sites has <br /> cm 0 y been fully remediated to the satisfaction of the <br /> County Environmental Health Department,the <br /> status of the sites has been changed to"no further <br />
The URL can be used to link to this page
Your browser does not support the video tag.