Laserfiche WebLink
cn n <br /> m o <br /> a — <br /> cD <br /> v College Park at Mountain House Specific Plan III <br /> v Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Date <br /> 0 Responsibility Action <br /> Completed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> N standards,the County shall extend the standard of <br /> `D LOS D to the segment of Byron Road east of Grant <br /> mLine Road. <br /> 0. Because Byron Road is a major regional arterial <br /> serving the area, the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP) E1R mitigation measure 4.12-5(e)to apply to <br /> Byron Road cast of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in , <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> v The latest version of the San Joaquin Valley Air <br /> 0 Pollution Control District(SJVAPCD)control <br /> o measures are included in the Guide for Assessing and <br /> Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> the SJVAPCD to implement the current version of the <br /> CDmeasures at the time individual development <br /> co <br /> applications are received by the County for <br /> development under College Park. <br /> Uno <br /> 4.12-2 Air Quality Potential Generation of Toxic Air Before construction SJVAPCD, in <br /> M <br /> Contaminants(TACs) begins and during conjunction with the <br /> 3 ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />