Laserfiche WebLink
cn n <br /> Q) o <br /> CD <br /> v (D College Park at Mountain House Specific Plan III <br /> _. v Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> o <br /> Completed <br /> 4.13.`NOISE <br /> o 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD, in <br /> CD Noise conjunction with the <br /> co < Limit project construction activities to the hours developer <br /> between 6:00 a.m. and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> _ Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> — fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> R installed around stationary equipment, if <br /> o necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SICCDD,in <br /> 7 Noise and during conjunction with the <br /> M. <br /> The project applicants shall incorporate the measures construction developer <br /> w <br /> identified below into the project design, <br /> C- Commercial,Office,and Industrial Uses <br /> CD Industrial and commercial land uses proposed as part <br /> of the College Park project,shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA Leq during daytime hours <br /> cq a (7:00 a.m. to 10:00 p.m.)or 50 dBA Leq during <br /> > nighttime hours(10:00 p.m. to 7:00 a.m.)at of-site <br /> noise-sensitive receptors. In addition,design and <br />