Laserfiche WebLink
cn 0 <br /> n� o <br /> ro <br /> wCD College Park at Mountain House Specific Plan III <br /> _. - Mitigation Monitoring and Reporting Program <br /> a ;-,L <br /> 0 Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Date <br /> 0 Responsibility Action Completed <br /> 2. 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> o Mountain House Parkway construction <br /> N The following measures shall be implemented by the <br /> (° College Park developers: <br /> U) <br /> CD <br /> < If the landscaping and edge treatments required <br /> O 41 <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> m House Parkway fronting the Pombo property by <br /> Specific Plans I or I1 at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed, the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition, the berm <br /> shall be constructed by the College Park developers <br /> �. using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> development of the pond. <br /> C1. <br /> CD <br /> 0 <br /> 0 <br /> cn <br /> o m ' <br /> = 0 <br />