Laserfiche WebLink
Y <br /> approval only by designating.a replacement lot to re1.ceive the second uriitfor each lot.from which a <br /> second unit is removed. All replacement parcels must be:within tFie.Specific Plan II area [SPlll . <br /> Implementation Measure 3.3.6.3 (b)]. The°Applicant shall place the following note on the applicable <br /> Final Maps for recordation: <br /> "Second unit dwellings shall'tie required on'at least •lots consistent with the:prehminary second <br /> unit plan approved with.the tentative map-and Chapter 9-830M of the San Joaquin Countjr <br /> Development'Title. The;location of an approved second unit may be amended by,Community.` <br /> Development Department only by designation of,a replacement lot to receive the second unit. All <br /> replacement parcels must be located within Specific Plan'lll Parcels for each-residential subdivision <br /> shall.be consistent'with the preliminary second unit plan,approved with the`Tentative Map. <br /> Timing: Condition shall be met prior to recordation of.each Final Map. <br /> 10. Agricultural Buffer: To the extent feasible, developers shall provide or secure a setback from <br /> development to existing agricultural operations of at least 100 feet. Occupancy permits shall not be <br /> issued for lots with less than a 40-foot setback from agricultural operations existing within a 12-month <br /> period prior to the time of final map approval. An exception to the requirement'for a setback may be <br /> granted when the owner of such agricultural land has indicated in writing that the land will no longer <br /> be used for agricultural production. [Implementation Measure 3.2.4.3 (d)] <br /> a <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to Final Map approval. <br /> i <br /> 11. Landscape Buffer and Agricultural Fence: A landscape buffer/easement of at least eight feet wide <br /> and an agricultural fence shall be provided adjacent to the existing abutting parcels along the <br /> southeast edge of Grant Line Village. [Specific Plan III, Implementation Measures 3.2.3.3 (c) and (e).] <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to Final Map approval. <br /> 12. Pedestrian Pathways: Final Maps shall maintain, as proposed, all feasible pedestrian connections. <br /> In instances where the proposed location of a pedestrian connection is determined by the Community <br /> Development Director to be in conflict with the health, safety and welfare of community residents, <br /> such connection may be eliminated. <br /> Timing: Improvement Plans approved by CDD and MHCSD prior to Final Map approval. <br /> 13. Design Guidelines: The proposed residential development shall comply with the applicable <br /> provisions of adopted/approved design guidelines. The following private design guidelines shall be <br /> applicable: Residential design guidelines developed by the developer and approved by CDD or, in <br /> lieu of said design guidelines, the College Park at Mountain House Specific Plan /it Residential <br /> Design Guidelines for Potential Housing Prototypes (.February 17, 2005) and the Mountain House <br /> Single Family Residential Design Manual(July 22, 2003). In addition, the proposed residential <br /> development shall comply with the Mountain House Community Services District Design Manual <br /> (June 17, 2005)with respect to public areas. Any proposed private design guidelines shall be <br /> submitted to the County for approval prior to approval of Final Maps. [Specific Plan III Implementation <br /> Measure 4.5.3-3 (a-d)] <br /> Conditions of Approval - 3 - PA-0700093 <br />