My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> include retention of tall vegetation, regular discing of the site, or use of chemicals or traps to <br /> kill ground squirrels; <br /> a. Pre-construction surveys for burrowing owls shall be conducted where project <br /> construction activities would occur within 75 meters of suitable habitat(based on SJCOG <br /> review). The survey shall be conducted within 2 weeks of the beginning of construction. <br /> If burrowing owls are found, the following measures shall be implemented: <br /> b. During the nonbreeding season (September 1 through January 31), burrowing owls <br /> occupying the project site shall be evicted from the.project site by passive relocation, as <br /> described in the DFG's Staff Report on Burrowing Owls (DFG 1995). <br /> c. During the breeding season (February 1 through August 31), occupied burrows shall not <br /> be disturbed and shall be provided with a 250-foot protective buffer until and unless the <br /> Technical Advisory Committee, with the concurrence of the permitting agencies' <br /> representatives on the Technical Advisory Committee, or a qualified biologist approved <br /> by the permitting agencies, verifies through noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles from the occupied burrows are foraging <br /> independently and are capable of independent survival. After the fledglings are capable <br /> of independent survival, the burrow can be destroyed. (MM 4.10-5) <br /> Timing: The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD)prior to the issuance of grading <br /> permits for the project. <br /> 32. Conversion of Common Nesting Raptor Sites: Potential nest sites for all tree-nesting <br /> species are scattered throughout much of the College Park site, but are concentrated along <br /> Grant Line Road and at Grant Line Village. Suitable nesting habitat for northern harrier is <br /> provided by all field crops and fallow fields. During the SJMSCP application process,SJCOG <br /> will determine whether that specific project site supports suitable nesting habitat. If SJCOG <br /> determines suitable habitat is present on or adjacent to a given project site, the SJMSCP <br /> incidental take avoidance and minimization measures described below for nesting raptors shall <br /> be implemented.Additional measures below shall be implemented to avoid loss of active nests <br /> of common raptor species,which are not covered under the SJMSCP but are protected under <br /> the California Fish and Game Code.The project applicants shall retain qualified biologists to <br /> conduct all pre-construction surveys. <br /> White-tailed Kite. If project construction begins during the nesting season (February 15— <br /> September 15), pre-construction surveys shall be conducted to investigate all potential <br /> nesting trees on the project site (e.g., especially tree-tops 15-59 feet above the ground in <br /> oak, willow, eucalyptus, cottonwood, or other deciduous trees),whenever white-tailed kites <br /> are noted on-site or within the vicinity of the site during the nesting season. A setback of 100 <br /> feet from white-tailed kite nesting areas shall be established and maintained during the <br /> nesting season for the period encompassing nest building and continuing until fledglings <br /> leave nests. This setback applies whenever construction or other ground-disturbing activities <br /> must begin during the nesting season in the presence of nests that are known to be <br /> occupied. Setbacks shall be marked by brightly colored temporary fencing. <br /> Northern Harrier. If project construction begins during the nesting season (February 15— <br /> August 31), pre-construction surveys shall be conducted during the nesting season in <br /> suitable nesting habitat within 500 feet of areas of project activity. The survey shall be <br /> conducted within the 2 weeks before construction begins. A setback of 500 feet from <br /> northern harrier nesting areas shall be established and maintained during the nesting season <br /> for the period encompassing nest building and continuing until fledglings leave nests. This <br /> setback applies whenever construction or other ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that are known to be occupied. Setbacks shall <br /> be marked by brightly colored temporary fencing. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.