Laserfiche WebLink
I I I I I I I I I I I I I I I I I I I <br /> Cnn <br /> a� o <br /> College Park at Mountain House Specific Plan III <br /> w Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule <br /> o Responsibility Action Date <br /> " � Completed <br /> �• 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> Land Uses construction, and Community <br /> The College Park developers shall implement the During design phase Development <br /> following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD), in <br /> Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled. The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons, and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5, identified <br /> in Section 4.9, "Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&E–Chevron <br /> o easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> o any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> line. <br /> n <br /> m <br /> S' <br /> co <br /> o m <br /> � p <br /> 3 <br />