Laserfiche WebLink
M O <br /> d College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> o <br /> 0Implementation <br /> o' Mitigation Measure Timing/Schedule Responsibility Action Date <br /> ZCompleted <br /> a4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> D In accordance with the California Health and Safety developer,and in <br /> P. Code, if human remains are uncovered during conjunction with <br /> construction at the project site,the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed, <br /> SJCCDD. The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find. The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> a 7050.5[b]). If the coroner determines that the remains <br /> are those of a Native American, he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> o determination(HSC Section 7050[c]). Once a Most <br /> F Likely Descendent(MLD)has been designated by the <br /> rn <br /> NAHC, the MLD, in consultation with the County, <br /> shall determine the ultimate disposition of the remains. <br /> R_ The responsibilities of the County for acting upon <br /> °= notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 5097.9. Measures likely resulting from the above <br /> could include preservation in place and <br /> o capping/avoidance,or removal and continued <br /> Cn <br /> 9 monitoring of ground-disturbing activities. <br /> CD <br /> o c 4.7 DRAINAGE <br /> d <br /> 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD, in <br /> Capacity of the Storm-drain System conjunction with the <br /> o <br /> The College Park developers shall expand WQB1 as developer <br /> required to accommodate runoff from the College <br /> ' = Park project,or shall provide the required on-site <br /> I l ! 1 l 1 ! ! [ <br />