Laserfiche WebLink
� m <br /> � o <br /> v College Park at Mountain House Specific Plan 1H <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action CompPleted <br /> cmaintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> CD <br /> $ during construction that could be present in <br /> ? stormwater drainage and non-stormwater <br /> discharges; <br /> B < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> CO measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> v <br /> hazardous materials used for equipment <br /> d operation and hazardous waste; <br /> < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> d subsequent site-development activities; <br /> x <br /> < Identify personnel training requirements and <br /> N procedures that wilt be used to ensure that <br /> workers are aware of permit requirements and <br /> 0 � proper installation and performance inspection <br /> ..0C, methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> o v supervisory duties related to implementation of <br /> > > the SWPPP; and <br /> — < Require all construction contractors to retain a <br /> 1 1 1 1 1 1 It 1 1 1 I t 1 I I I I 1 1 <br />