Laserfiche WebLink
K m <br /> ra' D <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> 6 Mitigation Measure Timing/Schedule Implementation Date <br /> �. Responsibility Action <br /> Completed <br /> nrequirements from the County Environmental <br /> Health Department.Dairy waste ponds or any <br /> CD other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> co accordance with applicable regulations and <br /> requirements from the Central Valley RWQCB or <br /> °a <br /> the California Department of Toxic Substances. <br /> ° This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts. If the testing <br /> reveals contamination, the regulatory agencies <br /> o shall be contacted,any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action'before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> m (i.e., septic systems,refuse piles, waste ponds, <br /> M electrical transformers containing PCBs)on the <br /> y project site and off-site infrastructure sites shall be <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> o accordance with applicable regulations before <br /> c� construction. The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> = the above has taken place before issuance of <br /> ybuilding permits. If the experts observe potential <br /> `D soil contamination or noxious odors associated <br /> N <br /> with these facilities, the soils underlying these <br /> c_. facilities shall be sampled and tested by the <br /> experts. If the testing reveals contamination, the <br /> mregulatory agencies shall be Contacted,any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br /> 1 1 ! i 1 1 1 1 1 1 1 1 1 1 1 1 11 L l <br />