Laserfiche WebLink
� m <br /> � o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Q. Implementation Mitigation Measure Timing/Schedule <br /> Responsibility Action <br /> Completed <br /> � <br /> naction required'in the regulatory agency <br /> databases, and the facilities that are the source of <br /> CD <br /> any contamination have been removed in <br /> accordance with applicable regulations. The <br /> co project developers may attempt to advance the <br /> 'v above, if they desire,by conducting their own <br /> 11 investigations of these sites in coordination with <br /> 3 the property owners and regulatory agencies, and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation, or modification of - <br /> structures on the project site and off-site <br /> N infrastructure sites constructed before 1981 <br /> (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR), the project developers <br /> shall contract with qualified hazardous materials <br /> o experts to survey these buildings for asbestos and <br /> lead-based paint.Demolition, renovation,or <br /> CD modification of any structures identified as <br /> containing asbestos or lead-based paint shall be <br /> performed by a licensed asbestos and lead-based <br /> K paint abatement contractor in accordance with <br /> o applicable regulations. <br /> c <br /> 4.9-4 Public Health and Safety—Locate a School Site in During design phase SJCCDD,in <br /> an Area of Potential Hazards conjunction with the <br /> d0 < The College Park developers shall have a developer and a <br /> o preliminary Endangerment Assessment(PEA) qualified hazardous <br /> rn prepared by a qualified hazardous materials materials expert;in <br /> d consultant for the school located near the Lucky J consultation with CDE <br /> Dairy, if required by California Department of and DTSC <br /> o v Education(CDE).The PEA shall be prepared in <br /> > > accordance with CDE and Department of Toxic <br /> K B Substances Control(DTSC)requirements and <br /> t 111 1 l 1 1 1 1 1 1 <br />