Laserfiche WebLink
I ! I I I I I I I I I I I I I 1 I I 1 <br /> � o <br /> vCollege Park at Mountain House Specific Plan III <br /> w Mitigation Monitoring and Reporting Program <br /> o; Implementation&Verification <br /> C, Implementation <br /> Mitigation Measure Timing/Schedule <br /> Y = Responsibility Action Completed <br /> P <br /> for Protection of the San Joaquin Kit Fox before <br /> 0 or during Ground Disturbance(US Fish and <br /> N Wildlife Service [FWS] 1999b)shall apply <br /> D (except that pre-construction survey protocols <br /> shall remain as established in the above <br /> 0 paragraph).These standards include provisions for <br /> 9 educating construction workers regarding the kit <br /> a) fox, keeping heavy equipment operating at safe <br /> speeds, checking construction pipes for kit fox <br /> occupation during construction, and similar low- <br /> or no-cost activities. <br /> 4.10-10 Biological Resources—Loss or Alteration of Before construction SJCOG,in <br /> w Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently DFG,USACE and/or <br /> mitigated by participation in the SJMSCP.Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> othe College Park project,a formal Section 404 <br /> delineation of waters of the United States, <br /> oincluding wetlands,shall be conducted by a <br /> ?: qualified biologist in the Tentative Map or <br /> development project area if the area includes <br /> j features that are potentially subject to United <br /> CL States Army Corp of Engineers(USACE) <br /> jurisdiction(ponds, irrigation canals,and <br /> drainages). The delineation shall be submitted to <br /> 5• USACE for verification. <br /> `n < If,based on the verified delineation, it is <br /> a mo determined that fill of waters of the United States <br /> would result from the Tentative Map or <br /> development project,authorization for such fill <br />