My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3m <br /> o <br /> D <br /> o College Park at Mountain House Specific Plan III <br /> = Mitigation Monitoring and Reporting Program <br /> 0 <br /> Implementation Implementation&Verification <br /> j: Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> CL ► Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> oGrant Line Road has potential to adversely affect <br /> ;. California red-legged frog. It may be necessary <br /> co to conduct a formal habitat assessment and <br /> v surveys to make such a determination. If it is <br /> c <br /> determined that adverse effects are unlikely to <br /> 3 occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process. Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> C) implemented.These may include limiting . <br /> m activities to certain seasons,minimizing <br /> m vegetation removal and in-water construction <br /> M activities,conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> construction areas. If necessary, appropriate <br /> aPA P <br /> ocompensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> = habitat and creation of additional habitat.. <br /> na <br /> Swainson's Hawk Before construction SJCOG,in <br /> o rn < If project construction begins during the (surveys shall be consultation with DFG <br /> $ Swainson's Hawk nesting season, as defined by conducted 2 weeks <br /> g DFG (March 1 to September 15), pre-construction prior to construction <br /> o -a surveys shall be conducted in areas of suitable activities) <br /> > > nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br /> L l 1. L 1 1 l 1 1 l l 1 I 1 1 1 1 1 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.