Laserfiche WebLink
3m <br /> o <br /> D <br /> o College Park at Mountain House Specific Plan III <br /> = Mitigation Monitoring and Reporting Program <br /> 0 <br /> Implementation Implementation&Verification <br /> j: Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> CL ► Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> oGrant Line Road has potential to adversely affect <br /> ;. California red-legged frog. It may be necessary <br /> co to conduct a formal habitat assessment and <br /> v surveys to make such a determination. If it is <br /> c <br /> determined that adverse effects are unlikely to <br /> 3 occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> Specific mitigation measures would be developed <br /> during the consultation process. Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> C) implemented.These may include limiting . <br /> m activities to certain seasons,minimizing <br /> m vegetation removal and in-water construction <br /> M activities,conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> construction areas. If necessary, appropriate <br /> aPA P <br /> ocompensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> = habitat and creation of additional habitat.. <br /> na <br /> Swainson's Hawk Before construction SJCOG,in <br /> o rn < If project construction begins during the (surveys shall be consultation with DFG <br /> $ Swainson's Hawk nesting season, as defined by conducted 2 weeks <br /> g DFG (March 1 to September 15), pre-construction prior to construction <br /> o -a surveys shall be conducted in areas of suitable activities) <br /> > > nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br /> L l 1. L 1 1 l 1 1 l l 1 I 1 1 1 1 1 I <br />