Laserfiche WebLink
Ko <br /> o' D <br /> College Park at Mountain House Specific Plan III <br /> o' <br /> Mitigation Monitoring and Reporting Program <br /> K <br /> mplementation Implementation&Verification <br /> 6 Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> CL 4.13-4 Noise--Compatibility of Proposed Land Uses After construction SJCCDD, in <br /> exceeding Predicted Noise Levels conjunction with the <br /> g The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> o < Traffic.Noise—Arterials.Before occupancy of qualified acoustical <br /> the fust residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> B segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> beat,or combination thereof.The exact location, <br /> height and character of the sound barrier shall be <br /> deterrnined by a noise consultant approved by the <br /> County, The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> C below 65 dBA L6/CNEL and as close to 60 dBA <br /> rn L&/CNEL as feasible.This mitigation shall be <br /> m funded through fair-share payments by the <br /> m <br /> College Park developers. <br /> 0 <br /> 0 <br /> c <br /> d <br /> 2 <br /> D c <br /> � m <br /> C <br /> o <br /> d <br /> a � <br /> c <br /> � n <br /> 0 <br /> o N <br /> c � <br /> L <br />