Laserfiche WebLink
i i i l I I i 1 i i l I I I I I I i i <br /> W0 <br /> W o <br /> d CO College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> °c g Mitigation Measure Timing/Schedule Implementation Date <br /> c Responsibility Action <br /> Completed <br /> 4.14.2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> = Mountain House Parkway construction <br /> yThe following measures shall be implemented by the <br /> M College Park developers: <br /> N < If the landscaping and edge treatments required <br /> 9. by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed, the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition, the berm <br /> shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> S <br /> �a <br /> m <br /> a <br /> rn <br /> � o <br /> 3 <br />