Laserfiche WebLink
MOuNTAIN HousE PROPOSED ALTAMONr HEIGHrs TENTATIVE MAP 4. ENVIRONMENTAL CnECKLisT <br /> 4.15 TRANsroRrAnoNfrRAFFtc <br /> The SPIIIEIR analyzed segments of arterial roadways and freeways as well as key <br /> intersections following buildout of the Mountain House Community in 2025. The 2025 peak- <br /> hour LOS on arterial streets before and after implementation of traffic mitigation measures <br /> recommended in the MEIR and approvals associated with Neighborhoods E, F and G were <br /> presented in the SPHIEIR(EDAW, 2005b, Table 4.11-15). The analysis reveals that most of <br /> 4 the segments would operate at an acceptable LOS even without mitigation. Traffic impacts <br /> on these segments would therefore be less than significant. Roadway widening is needed to <br /> maintain acceptable LOS in some segments. With implementation of the mitigation <br /> measures, only the segment of Altamont Pass west of Grant Line Road remains at LOS F. <br /> Following mitigation, the following segments would have LOS D: <br /> .. • Byron Road cast on Grant Line Road during the afternoon peak-hour. <br /> • Grant Line Road east of Mountain House Parkway during the afternoon peak-hour. <br /> ti • Grant Line Road east of Byron Road during the morning and afternoon peak-hours. <br /> The current traffic computer model projects a peak-hour traffic demand of approximately <br /> 21,000 vph along Tracy/Mountain House corridor of I-205 in 2025. The freeway would not <br /> be able to accommodate all the projected demand in one hour, and the projected traffic could <br /> only be realized through peak spreading(i.e., spreading the traffic out over more than one <br /> ` hour). Most segments of I- 580, I-205, and I-5 north of I-205 are expected to be over their <br /> capacity, operating at LOS F (EDAW, 2005b). This is a significant and unavoidable <br /> impact,with or without the proposed project. <br /> As commute traffic on highway facilities reaches congested levels,commuters begin to <br /> change their travel patterns by either finding less congested routes or commuting during off- <br /> peak hours. Already, some traffic leaves the freeways and travels along parallel roadways <br /> such as Von Sosten Road, Grant Line Road, and Byron Road in the Specific Plan III area and <br /> Altamont Pass Road further west of the Specific Plan III area(EDAW, 2005b). <br /> The 2025 morning and afternoon peak-hour LOS for 50 intersections(assuming the proposed <br /> I-205/Lammers Road interchange is not constructed) are presented in of the SPIIIEIR <br /> (EDAW,2005b,Table 4.11-16). The data in the table is based on the assumption that the <br /> improvements in the MEIR and the approvals for Neighborhoods E,F and G, as well as the <br /> Grant Line Road improvements proposed in Specific Plan III,have been implemented. No <br /> intersections would have a LOS F. The following intersections would operate at LOS D: <br /> • Grant Line Road/Altamont Pass Road during morning and afternoon peak-hours. <br /> • Mountain House Parkway/Byron Road in the afternoon. <br /> • Byron Road/Henderson Road in the morning. <br /> • Great Valley Parkway/Byron Road in the afternoon. <br /> All these intersections would require traffic signal control(EDAW, 2005b). <br /> w <br /> All the Mountain House streets would be built to accommodate projected traffic generated by <br /> build-out of the Mountain House Community and other planned developments in the area. <br /> 4-76 <br />