Laserfiche WebLink
II <br /> i <br /> MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4_ ENVIRONMENTAL CHECKLIST <br /> - 4.13 PUBLIC SERV ICES <br /> Mitigation Measures _ r <br /> No mitigation measures are required. <br /> ` Schools? , <br />' As shown in Table 4.13-1',"'t c proposed project would generate demand for school services <br /> and facilities because 36 K-8 and nine high school students are projected to be living in the <br /> project residences at buildout. <br /> Table 4.13-1 <br /> Student Generation <br /> Grade Level Proposer]Dwelling Units Student Generation Rate Total <br /> K-8 53a 0.676 per dwelling unitb 36 <br /> High School 53a 0.179 per dwelling unitb 9 <br /> Notes: 'Excluding secondary dwelling units that would accommodate only one adult resident each. <br /> f b EDAW,2005a- <br /> LESD is currently operating the Wicklund Elementary School that has an available capacity <br /> for 216 additional students. LESD believes this school will be at capacity within two years. <br /> LESDplans to construct and operate two new K-8 schools one <br /> p each in Neighborhoods E <br /> and G in the Specific <br /> Plan 1 area each with <br /> p a capacity for 850 students. The new school in <br /> Neighborhood E i <br /> g isanticipated to be operating to 2006_ Until this K-8 school is constructed, <br /> students from the proposed project would be bussed (or driven) to the operating K-8 schools <br /> in the Specific Plan I area(EDAW, 2005b). <br /> A new high school (to be named Mountain House High School) would be constructed at the <br /> southeast cornet of Central Parkway and Mascot Boulevard as required by the MHMP. <br /> Mountain House High School will have an ultimate capacity for 2,400 students and will be <br /> built in phases to accommodate growing student population from the ongoing residential j <br /> development at the Mountain House Community,including the proposed project. The first <br /> phase of Mountain House High School is planned to accommodate 650 students. The Tracy <br /> Unified School District(TUSD)would staff and operate the high school and will determine <br /> when the school will be constructed. _ <br /> Until Mountain House High School is built and operating, highschool students residing in <br /> the Mountain House Community would be bussed(or driven) to either West High School or <br /> Tracy High School located in Tracy- However, these two high schools are currently over <br /> capacity and should not accept additional students- TUSD has acknowledged this problem <br /> and plans to use additional portable buildings as classrooms on an interim basis until <br /> Mountain House High School opens. TUSD would determine the location of temporary <br /> facilities as the need arises or in the event that construction of Mountain House High School <br /> is delayed (EDAW, 2005b). <br /> i 4-66 <br />