My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006254
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600364
>
SU0006254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 3:43:59 PM
Creation date
9/5/2019 10:46:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006254
PE
2691
FACILITY_NAME
PA-0600364
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600364\SU0006254\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1070
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
easement shall be evaluated. If dedication of a conservation easement is not a feasible <br /> option, the SJMSCP requires a consultation with the permitting agency representatives on <br /> the Technical Advisory Committee to determine the appropriate mitigation measures.. These <br /> may include seed'collection or other measures and would be determined on a population <br /> basis, taking into account the species type, relative health, and abundance.After the <br /> appropriate mitigation has been determined, it.shall be implemented by the project <br /> proponents [Ililitigation Meas`t re4.10-2j'.. <br /> 31. Conversion of Burrowing Owl Habitat:` If SJCOG determines suitable habitat is present on <br /> or adjacent to�a`giuen,project site;the,following SJMSCP incidental take avoidance and,- <br /> minimization measures shall Abe.impleme'rited <br /> a. Burrowing owls shall be discouraged from entering or occupying construction areas by <br /> employing one of several methods outlined in Section 52.4.15-of the SJMSCP.. These <br /> include retention of tall vegetation,regular discing of the site, or use of chemicals or traps <br /> to kill ground squirrels; <br /> b. Pre-construction surveys for burrowing awls shall be conducted where project <br /> construction activities would occur within 75 meters of suitable habitat(based on SJCOG <br /> review). The survey shall be conducted within 2 weeks of the beginning of construction. <br /> If burrowing owls are found, the following measures shall be implemented: <br /> 1) During the nonbreeding season (September 1 through January 31.), burrowing owls <br /> occupying the project site shall be evicted from the project site by passive relocation, <br /> as described in the DFG's Staff Report on Burrowing Owls(DFG 1995). <br /> 2) During the breeding season (February 1 through August 31),occupied burrows shall <br /> not be disturbed and shall be provided with a 250-foot protective buffer until and <br /> unless the Technical Advisory Committee, with the concurrence of the permitting <br /> agencies' representatives on the Technical Advisory Committee, or a qualified <br /> biologist approved by the permitting agencies, verifies through noninvasive means <br /> that either(1)the birds have not begun egg laying or(2)juveniles from the occupied <br /> burrows are foraging independently and are capable of independent survival. After <br /> the fledglings are capable of independent survival, the burrow can be destroyed. <br /> (MM 4.10-5) <br /> Timing_ The applicant shall submit a biologist's report of pre-construction surveys to the San <br /> Joaquin County Community Development Department(CDD) prior to the issuance of grading <br /> permits for the project. <br /> 32. Conversion of Common Nesting Raptor Sites: Potential nest sites for all tree-nesting <br /> species are scattered throughout much of the College Park site, but are concentrated along <br /> Grant Line Road and at Grant Line Village. Suitable nesting habitat for northern harrier is <br /> provided by all field crops and fallow fields. During the SJMSCP application process, SJCOG <br /> will determine whether that specific project site supports suitable nesting habitat. If SJCOG <br /> determines suitable habitat is present on or adjacent to a given project site,the SJMSCP <br /> incidental take avoidance and minimization measures described below for nesting raptors shall <br /> be implemented. Additional measures below shall be implemented to avoid loss of active nests <br /> of common raptor species,which are not covered under the SJMSCP but are protected under <br /> the California Fish and Game Code.The project applicants shall retain qualified biologists to <br /> conduct all pre-construction surveys. <br /> White-tailed Kite. If project construction begins during the nesting season (February 15— <br /> September 15), pre-construction surveys shall be conducted to investigate all potential <br /> nesting trees on the project site (e.g., especially tree-tops 15-59 feet above the ground in <br /> oak,willow, eucalyptus,cottonwood, or other deciduous trees),whenever white-tailed kites <br /> are noted on-site or within the vicinity of the site during the nesting season_ A setback of 100 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.