Laserfiche WebLink
26. Wastewater Treatment Plant: <br /> A. Under the direction of,the MHCSD, the applicant shall fund, design and construct a <br /> phased,-expansion of,the.wastewater treatment plant (WWTP)of sufficlent capacity, no <br /> less than 1.5 mgd;.to serve Tract.No. 3646 pnor;to'issuance:,of the first building'permit. <br /> Recognizing that 4here-may be agreements between.the developers€or sharing capacity <br /> and also,recognizing that the MHCSD'is nota party:-fo a`nd,t as no control over such <br /> agreements, bonding for construction-shall be provided prior to approval of'the}frst final <br /> map and beginning of construction shall be at the,discretion of the'General Manager. <br /> Issuance,of building permitsshall cease if construction does not begin when directeii.by <br /> the General Manager. <br /> B. The developer shall extend existing pipelines to the project site as-shown on`the Master <br /> Sanitary Sewer Plan. The developer shall also extend the sanitary sewer system <br /> pipelines to the Grant Line Village frontage road a's-directed by the General Manager in <br /> order to serve the residents of Grant Line Village. Interim treated wastewater land' <br /> disposal capacity andpiping system to serve the proposed project shall be provided by <br /> the developer until such time as the river discharges commence. Initiation of State` <br /> Permit Application for land application of the treated discharge requirement shall parallel <br /> the treatment plant capacity condition noted above, as directed by the General Manager. <br /> C. The Wastewater Treatment Plant expansion requirement in Condition 26.A shall'meet <br /> the requirements of the Regional Water Quality Control Board (RWQCB)effluent . <br /> permits, including compliance scheduling, testing and any infrastructure that may be <br /> required for long-term discharge into Old River. Additional treatments'that may be <br /> required by the RWQCB for such pollutants as dissolved solids, metals and heat, <br /> etc., shall be addressed in the plant expansion. The developer shall bond for or fund <br /> construction for the developer's fair share cost prior to the filing of the first Final Map. <br /> 27. Water Treatment Plant: Under the direction of the MHCSD, the applicant shall fund, design <br /> and construct the last phased expansion of the water treatment plant(WTP)to provide the <br /> capacity required to serve Tract No.3646 prior to Issuance of the first building permit. <br /> Recognizing that there may be agreements between the developers for sharing capacity and <br /> also recognizing that the MHCSD is not a party to and has no control over such agreements, <br /> bonding for construction shall be provided prior to approval of the first final map and <br /> beginning of construction shall be at the discretion of the General Manager. Issuance of <br /> building permits shall cease if construction does not begin when directed by the General <br /> Manager. <br /> 28, Other Water System Facilities:Water storage requirements, booster pump station and <br /> looping of the water distribution system pipelines shall be done in accordance with the Water <br /> Master Plan and as directed by the MHCSD prior to issuance of the first building permit in <br /> SP III. Construction of one tank may be allowed if an engineering analysis shows that the <br /> second tank may be constructed at a later date without adverse impact on the first tank <br /> and/or existing customers of MHCSD. Each phase of SPIII will be reviewed to confirm the <br /> existing"in-place"infrastructure is adequate to provide MHCSD Design Standards. <br /> 29, Construction Emissions: The applicant shall implement the following: Regulation Vlll <br /> Control Measures of the SJVAPCD and applicable measures in Table 6-3 of the SJVAPCD <br /> Guide for Assessing and Mitigating Air Quality Impacts. Timing: Note on improvement <br /> plans approved by the MHCSD for Tract 3646. <br /> 30. BBID Canal: The applicant shall reroute the canals as directed by BBID in order to ensure <br /> continued supply of agricultural irrigation water to lands remaining in agricultural use <br /> following construction. Timing: Approval of the rerouting and grading and improvement <br /> plans approved by MHCSD prior to approval of first Final Map. <br /> 24 <br />