Laserfiche WebLink
M <br /> Ko <br /> cC]' D <br /> °= College Park at Mountain House Specific Plan,III <br /> o' <br /> Mitigation:Monitoring and Reporting Program <br /> ? Implementation Implementation&Verification <br /> c0 Mitigation Measure Timing/Schedule Responsibility1]ate <br /> Action <br /> Completed <br /> 0 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD, in <br /> Remains conjunction with the <br /> In accordance with the California Health and Safety developer,and in <br /> Code, if human remains are uncovered during conjunction with <br /> construction at the project site, the College Park qualified archaeologist. <br /> ro developer or construction contractor shall immediately and County Coroner, <br /> 0 <br /> halt potentially damaging excavation and notify if needed. <br /> 3 SJCCDD.The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> o, 7050.5[b]). if the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that. <br /> c determination(HSC Section 7050[c]).Once a Most <br /> Likely Descendent(MLD)has been designated by the <br /> co NAHC,the MLD,in consultation with the County, <br /> shall determine the ultimate disposition of the retrains. <br /> The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 3 5097.9. Measures likely resulting from the above <br /> could include preservation in place and <br /> z capping/avoidance, or removal and continued <br /> monitoring of ground-disturbing activities. <br /> 0 0 4,7 DRAINAGE <br /> n 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD,in <br /> Capacity of the Storm-drain System conjunction with the <br /> a The College Park developers shall expand WQB 1 as developer <br /> m <br /> required to accommodate runoff from the College <br /> `C = Park project,or shall provide the required on-site <br /> `-----.', .. !'--- .-..�.. ,�r .ter ...�... ��. .....r+ F+i..wA ru.+.^ �R ....� �, ■..rr� n+..�..� �r.Mrw� <br /> i 1' <br />