Laserfiche WebLink
r. <br /> rn <br /> ca' b <br /> oCollege Park at Mountain House Specific Plan III <br /> M Mitigation Monitoring nand Reporting Program <br /> 0 <br /> c <br /> implementation Impiementation Mitigation Measure Timing/Schedule . <br /> 8 Verificntion <br /> ' Responsib':lityAeon Date <br /> amaintenance responsibilities; Com feted <br /> < Specify the pollutants that are likely to be used <br /> during construction that could be present in <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> n < Identify the types of materials used for <br /> o equipment operation; <br /> CD <br /> < Identify measures to prevent or clean up spills of <br /> CD hazardous materials used for equipment <br /> v operation and hazardous waste; <br /> 9 < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> w subsequent site-development activities; <br /> z < Identify personnel training requirements and <br /> Nprocedures that will be used to ensure that <br /> ro workers are aware of permit requirements and <br /> N-0 proper installation and performance inspectionCD <br /> . - <br /> methods for specified BMPs; <br /> < identify the appropriate personnel responsible for <br /> csupervisory duties related to implementation of <br /> the SWPPP; and <br /> < Require all construction contractors to retain a <br /> p..r..R O...w mom" P=WW. won" ,MM.M.A1, own" <br /> i <br />