Laserfiche WebLink
ccs <br /> ' College Park at Mountain House Specifie-Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> �. Mitigation Measure Timing/Schedule ResponsibilityAction Date <br /> Completed <br /> ¢ requirements from the County Environmental <br /> Health Department.Dairy waste ponds or any <br /> other sources of contamination shall be removed <br /> under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> orequirements from the Central Valley RWQCB or <br /> the California Department of Toxic Substances, <br /> This includes the December 4,2003 crude oil <br /> releases and any migration of it to the project site, <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts, If the testing <br /> reveals contamination, the regulatory agencies <br /> shall be contacted, any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> a < Other potential existing sources of contamination <br /> (i.e.,septic systems,refuse piles,waste ponds, <br /> m electrical transformers containing PCBs)on the <br /> project site and off-site infrastructure sites shall be <br /> v <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> oaccordance with applicable regulations before <br /> construction.The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> the above has taken place before issuance of <br /> building permits.If the experts observe potential <br /> ro soil contamination or noxious odors associated <br /> W CD with these facilities, the soils underlying these <br /> -o, facilities shall be sampled and tested by the <br /> experts.If the testing reveals contamination,the <br /> 0 5;- regulatory agencies shall be contacted,any <br /> — recommendations made by the experts shall be <br /> implemented, and the County Environmental <br /> r.+." 0t—" P+.r" I�" Pao" <br />