Laserfiche WebLink
rn <br /> b <br /> _• College Park at Mountain House Specjific•P1an III <br /> Mitigation Monitoring and Reporting Program <br /> Q <br /> Implementation Implementation&verkatlon <br /> Mitigation Measure Timing/Schedule Responsibility Date. <br /> cn Action <br /> aduring the nesting season(February I5--August ComR lefed <br /> CD <br /> 0 31),pre-construction surveys shall be conducted <br /> $ during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity. The survey shall be conducted within <br /> 0 <br /> the 2 weeks before construction or tree removal <br /> LO begins. If any active nests are found,a setback of <br /> 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> o ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG, in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> `D Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to.construction <br /> under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> c° and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> site supports suitable habitat for loggerhead shrike, <br /> California horned lark,or tricolored blackbird.If <br /> CD <br /> o 0 SJCOG determines suitable habitat is present on or " <br /> j� CD adjacent to a given project site,the following <br /> SJMSCP incidental take avoidance and minimization <br /> n measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br />