Laserfiche WebLink
5: m <br /> a <br /> o College Park at Mountain House Specific PIan III <br /> a Mitigation Monitoring and Reporting Program <br /> 0 <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Date <br /> Action <br /> Completed <br /> 4.13-4 Noise—Compatibility of Proposed Land Uses After construction SJCCDD, in <br /> exceeding Predicted Noise Levels' conjunction with theCD . <br /> CD The College Park developers shall implement the developer;in . <br /> a% following measures: consultation with a <br /> < Traffic Noise--Arterials.Before occupancy of qualified acoustical <br /> othe first residence proposed under the College consultant <br /> `a Park prosect along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm, or combination thereof.The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shaalI reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> 6 below 65 dBA La,/CNEL and as close to 60 dBA <br /> CD La,/CNEL as feasible.This mitigation shall be <br /> v funded through fair-share payments by the <br /> w <br /> College Park developers, <br /> 0 <br /> C <br /> 47 <br /> O <br /> C <br /> M m <br /> U) <br /> o � <br /> m CD <br /> n -0 <br /> o <br /> c � <br />