Laserfiche WebLink
v o ' <br /> CD <br /> College Park at Mountain House Specific' Pian IH <br /> CD <br /> - Mitigation Monitoring and Reporting Program <br /> a Implementation&Verlfication <br /> 0 a; Implementation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> g G Completed <br /> a <br /> L• 4,14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> x Mountain House Parkway construction <br /> cThe following measures shall be implemented by the <br /> o College Park developers: <br /> < If the landscaping and edge treatments required' <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> v House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pornbo property,the <br /> required landscaping and edge treatments.on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is.developed, the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers. In addition,the berm <br /> shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> 0 <br /> L <br /> v <br /> n <br /> ro <br /> c <br /> "O <br /> cfl Q <br />