Laserfiche WebLink
M m <br /> n <br /> °= College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and'Reporting Program <br /> Implementation Implementation&Verification <br /> o' Mitigation Measure Timing/Schedule Date <br /> • Responsibility Action Completed <br /> m <br /> CL requirements from.the County Environmental <br /> 7 Health Department.Dairy waste ponds or any <br /> CD <br /> 0 other sources of contamination shall be removed <br /> 7 under a Qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> orequirements from the Central Valley RWQCB or <br /> the California Department of Toxic Substances, <br /> This includes the December 4, 2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts, If the testing <br /> reveals contamination,the regulatory agencies <br /> a shall be contacted,any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> co m <br /> (i.e.,septic systems,refuse piles,waste ponds, <br /> <n electrical transformers containing PCBs)on the <br /> m project site and off-site infrastructure sites shall be <br /> RL identified and removed under the supervision of <br /> Qualified hazardous materials experts and in <br /> oaccordance with applicable regulations before <br /> construction.The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> o the above has taken place before issuance of <br /> C/) N building permits.If the experts observe potential <br /> C— soil contamination or noxious odors associated <br /> W m with these facilities,the soils underlying these <br /> facilities shall be sampled and tested by the <br /> n experts.If the testing reveals contamination,the <br /> e = regulatory agencies shall be contacted,any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br />