Laserfiche WebLink
aCollege Park at Mountain House Specific:Plan III <br /> a, Mitigation Monitoring and Reporting Program <br /> 5 � <br /> 0v Implementation&Vedficatton . <br /> Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Action CAmpleted <br /> shall be reviewed and approved by CDE,DTSC, <br /> the S]CCDD,and the Lammersville School <br /> yDistrict. If these agencies determine,based on the <br /> CD PEA, that the school site does not meet CDE <br /> siting requirements,the proposed school shall be <br /> 0. developed at a different location within the <br /> n College Park site,subject to clearance by a new <br /> PEA to be.funded by the developers.If the new <br /> school site is required, the developers shall be <br /> responsible for processing the required <br /> amendment to the College Park Specific Plan III <br /> and obtaining and dedicating the new school site <br /> to the school district. The assessment and analysis <br /> would be conducted in accordance with CDE <br /> requirements and would be under separate CEQA <br /> documentation. <br /> 4.9-5 Public Health and Safety—Exposure to Pipeline During design phase SJCCDD,in <br /> Hazards conjunction with the <br /> The following measures shall be implemented by the developer <br /> oCollege Park developers: <br /> < No habitable residential structures(i.e.,homes, <br /> aapartments,granny flats,garages converted to <br /> o' living quarters,patio rooms,sun rooms)shall be <br /> permitted within 68 feet of the PG&E–Chevron <br /> m pipeline that bisects the College Park site and <br /> a contains Pipelines L401, L002,and CSDF 0499. <br /> cru Alternatively,no habitable residential structures <br /> o as defined above shall be permitted within 68 <br /> feet of the nearest pipeline in the PG&E <br /> easement. Outdoor structures such as pools, <br /> 3 M fences,patios,and decks could be allowed within <br /> the no build zone,since occupancy would be less <br /> 3 than 100%. Garages would be permitted as long <br />