Laserfiche WebLink
M ,77i- ,_,,# *_—_n _n ` <br /> G7 (� <br /> d p . <br /> m College Park at Mountain House Specific.Plan.III <br /> c ni Mitigation Monitoring and'Reporting Program <br /> 00 Implementation A Verification <br /> Mitigation Measure Timing/Schedule Implementation <br /> ate <br /> Responsibility Action <br /> Completed <br /> biologist within the 2 weeks before construction <br /> 0 or tree removal begins.If no active nests are <br /> Ch found,no further mitigation shall be required. <br /> cA < If active nests are found,impacts shall be <br /> avoided by establishment of appropriate buffers. <br /> CD <br /> No project activity shall commence within the <br /> buffer area until a qualified biologist confirms <br /> v that the nest is no longer active.DFG guidelines <br /> recommend implementation of 0.25-or 0.5-mile <br /> buffers,but the size of the buffer may be adjusted <br /> if a qualified biologist and DFG determine it <br /> would not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> may be required if the activity has potential to <br /> adversely affect the nest. <br /> Burrowing Owl Before construction SJCOG,in <br /> < Before project activity,focused surveys for consultation with DFG <br /> M burrowing owls shall be conducted by a qualified <br /> biologist in areas of suitable habitat on and <br /> within 250 feet of the project site. Surveys shall <br /> be conducted in accordance with DFG protocols <br /> (DFG 1995). <br /> < If no occupied burrows are found in the survey <br /> area,a letter report documenting survey methods <br /> and findings shall be submitted to DFG,and no <br /> �- further mitigation is necessary. <br /> < If an occupied burrow with an active nest is <br /> o found,impacts shall be minimized by <br /> establishing a 250-foot buffer area around the <br /> n burrow.No project activity shall occur within the <br /> M buffer area until a qualified biologist confirms <br /> 3 that the nest is no longer active.The size of the <br /> buffer area may be adjusted if a qualified <br />