Laserfiche WebLink
G7 0 <br /> m a <br /> co <br /> Q College 'ark at Mountain House.Specific Plan']H <br /> Mitigation Monitoring and Reporting Program.: <br /> lm Implementation <br /> implementation&VerifeaGan <br /> o Mitigator Measure TirninglSchedule Responsibility Action Date <br /> Compiefed <br /> 4.13. NOISE <br /> 0 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the <br /> -a < Limit project construction activities to the hours developer <br /> between 6:00 a.m, and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment; <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds,in accordance with manufacturers' <br /> recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> v installed around stationary equipment,if <br /> 0 necessary. <br /> 0 <br /> 14.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> Noise and during conjunction with the. <br /> �. The project applicants shall incorporate the measures construction developer <br /> �u <br /> identified below into the project design. <br /> 4 Commercial,Office,and Industrial Uses <br /> cn Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> exceedance of 55 dBA L,4 during daytime hours <br /> (7:00 a.m. to 10:00 p.m.)or 50 dBA L,during <br /> 3 > nighttime hours(10:00 p.rrL to 7:00 a.m.)at off-site <br /> noise-sensitive receptors. In addition, design and <br />