Laserfiche WebLink
M © <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o implementationA Verification <br /> o. Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility, Action. <br /> LO CompEeted <br /> 4.13-4 Noise--Compatibility of Proposed Land Uses After construction SICCDD,in <br /> exceeding Predicted Noise Levels conjunction with the <br /> cc <br /> -8 The College Park developers shall implement the developer,is <br /> a following measures: consultation with a <br /> (0 < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> othe fust residence proposed under the College consultant <br /> (0 Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm, or combination thereof. The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> C- proposed adjacent single-family residences to <br /> m below 65 dBA L&/CNEL and as close to 60 dBA <br /> Ld,,/CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> College Park developers. <br /> O <br /> C <br /> SU <br /> D Cn <br /> ❑] N <br /> � n <br /> a C7 <br /> O aj <br /> C � <br /> `C <br />