Laserfiche WebLink
3W �W <br /> ` ] 'W ,rte <br /> O C7 <br /> a) o <br /> O <br /> m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 00 Implementation&Verification <br /> p Implementation <br /> C Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and,after MHCSD <br /> z Mountain House Parkway construction <br /> NThe following measures shall be implemented by the <br /> CD College Park developers: <br /> C/) <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property;the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers. This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is,developed,the <br /> west-facing pond berm shall be densely landscaped <br /> K by the College Park developers. In addition,the berm <br /> - -- shall be constructed by the College Park developers <br /> co <br /> °= using contoured and rounded slopes to avoid angular <br /> face slopes. This shall be done concurrent with <br /> o development of the pond. <br /> 0 <br /> M. <br /> v <br /> Q <br /> CD <br /> 7• <br /> CQ <br /> o m <br /> CU <br /> ca � <br />