Laserfiche WebLink
4 <br /> ENVIRONMENTAL CHECKLIST <br /> This chapter of the Checklist includes a discussion of existing environmental conditions at <br /> F the site,potential environmental impacts resulting from implementation of the proposed <br /> project,and applicable mitigation measures, if any. The Environmental Checklist covers <br /> specific issues by topic (i.e.,Aesthetics, Geology,Land Use, etc.). Each topic includes the <br /> F bureaucracy following four sections: (1) Setting; (2) Significant Impacts Identified in the <br /> 2005 SPIIIEIR; (3) Mitigation Measures of the 2005 SPIREIR.Relevant to the Project; and <br /> (4) Discussion Regarding the Proposed Project. The Checklist questions are shown with a <br /> F, solid box denoting the potential level of impact. Under the Discussion,if new impacts are <br /> identified, they are followed by mitigation measures that are labeled and numbered. <br /> Mitigation measures that were adopted by the Mountain House Master Plan Final EIR <br /> E [ (MEIR) and College Park at Mountain House Specific Plan III Final EIR(SPIIIEIR)are <br /> identified along with any additional required mitigations based on the current analysis in this <br /> Checklist. The criteria for significance are also identified,when applicable. <br /> Since this Checklist relies on the SPIIIEIR,the standard Checklist has been modified to <br /> Fi <br /> address the consistency between the environmental evaluation prepared for Specific Plan III <br /> and the environmental evaluation for the proposed project. The six Checklist categories <br /> include: (1)Less Than Significant or No Impact, (2) Potentially Significant Impact <br /> Adequately Addressed in SPIIIEIR; (3) SPIIIEIR Requires Additional Review: No <br /> F1 Significant Impact; (4)Less Than Significant Impact Due to Mitigation Measures in Project <br /> Description; (5)New Additional Impact Not Addressed in SPIIIEIR; and(6)New Additional <br /> Mitigation Measures Required. <br /> The "Discussion" follows the checked boxes so that the reader is informed as to why a <br /> specific box of the Checklist was marked. The discussions identify earlier analyses, the <br /> source of the information for the conclusion reached, and mitigation measures either already <br /> required for the project or suggested as part of the current analysis to reduce impacts to a <br /> Filess-than-significant level. <br /> ` The proposed project has been analyzed under each component of the Checklist. It has been <br /> determined that the proposed project presents no substantial changes with respect to the <br /> circumstances under which the SPIREIR was certified. There are no impacts associated with <br /> the proposed project that were not previously assessed in the SPIIIEIR. There is no new <br /> available information,which was not known at the time the SPIIIEIR was certified,that <br /> requires major revisions of the document. Thus, no additional environmental documentation <br /> is required. <br /> ! f <br /> MOUNTAIN HODS£PROPOSED ALTAmoNT HEIGHTs TENTATIVE MAP 4-1 <br />