Laserfiche WebLink
i <br /> MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENVIRONMENTAL CHECKLIST <br /> 4.3 AIR QUALITY <br /> refuse piles are removed. The Altamont Heights project site is over one mile west of the <br /> abandoned dairies at Mountain House Parkway and Grant Line Road.. <br /> Development of the proposed project would involve demolition or renovation of existing <br /> t buildings that may contain.asbestos. Therefore, the-propose.d project could contribute to the <br /> conditions that make Impact 4.12-2 significant and unavoidable. <br /> E Development of the proposed project would result in increases in long-term regional <br /> emissions, primarily associated.with automobile traffic. Therefore,-the proposed project <br /> would contribute to the conditions that make Impact 4.12-,5 significant and unavoidable. <br /> DISCUSSION REGARDING PROPOSED PROJECT s. <br /> a) Conflict with or obstruct implementation of the applicable air quality plan? <br /> and <br /> j b) Violate any air quality standard or contribute substantially to an existing or projected <br /> air quality violation? <br /> and <br /> c) Result in a cumulatively considerable net increase of-any criteria pollutant for which <br /> the project region is non-attainment under an applicable federal or state ambient air <br /> quality standard(including releasing emissions which.exceed quantitative thresholds, <br /> for ozone precursors)? <br /> Development of Specific Plan III, of which the proposed project is a part,would generate <br /> t construction, motor vehicle,and other air emissions (ftom fireplaces,barbecues, etc)_ The <br /> MEIR calculated the potential air quality impacts associated with these emissions as part of <br /> the greater MHMP development and concluded that a significant unavoidable impact would <br /> occur (i.e.,conflict with or obstruct implementation of the SJVAPCD Air Quality Attainment <br /> Plan) even with implementation of the mitigation measures identified in the MEIR. <br /> Development of Specific Pian III could potentially conflict with the Air Quality Attainment <br /> Plan, violate air quality standards, contribute substantially to an air quality violation, and/or <br /> result in a cumulatively considerable net increase of criteria pollutants for which the region is <br /> in non-attainment(EDAW, 2005b). <br /> Computer model results presented in the SPIIIEIR revealed that development of Specific <br /> + Plan III would result in long-term regional emission of approximately 58 tons per year of <br /> reactive organic gas (a precursor to the formation of ozone), 38 tons per year of the oxides of <br /> nitrogen(principally nitrogen dioxide), and 112 tons per year of PMIa_ SJVAPCD's <br /> recommended significance threshold for each of these emissions is 10 tons per year. <br /> Therefore, development of Specific PIan IN,may contribute to concentrations that exceed <br /> applicable standards because of current non-attainment conditions (EDAW, 2005b). The <br /> resulting impacts would be significant and unavoidable. <br /> R <br /> 4-14 <br />