Laserfiche WebLink
MOUNTAIN HOUSB PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENvIRoNMENTAL CHECKLIST <br /> 4.8 HYDPoLOGY AND WATER QUALITY <br /> The project site is not within a 100-year flood hazard area as mapped in the MHMP (Figure <br /> 15.7) or on a FEMA Flood Insurance Rate Map. No impact would occur(EDAW, 2005b). <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> h) Place within a 100 year flood hazard area structures which would impede or redirect <br /> flood flows? <br /> Refer to discussion for Item g) above. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> i) Expose people or structures to a significant risk of loss, injury or death involving <br /> flooding, including flooding of as a result of the failure of a levee or dam? <br /> Refer to discussion for Item g),above. The project site is not located downstream of any <br /> levee or dam. The lowest elevation of the project site is higher than the tops of the levees <br /> along the south side of Old River, thus the site would not be subject to flooding if a levee <br /> along Old River should fail. Although unlikely, if a severe earthquake should rupture the <br /> Delta Mendota Canal or the California Aqueduct,the pump stations that feed the canals <br /> would be shut down to save water and avoid any downstream flooding until the canals could <br /> be repaired. <br /> �E <br /> Mitigation Measures <br /> F] No mitigation measures are required. <br /> � f <br /> F <br /> j) Inundation by seiche, tsunami, or mudfl'ow? <br /> The proposed project would not be subject to a seiche or tsunami because the project site is <br /> not located near any large water bodies. The project site,when developed, and the adjacent <br /> lands to the south and west would have no terrain features high and steep enough to generate <br /> a mudflow that would impact the project site. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> F <br /> SOURCES OF INFORMA'T'ION <br /> f EDAW, 2005a. College Park at Mountain House, Specific Plan III, Revised Draft,June 10. <br /> EDAW, 2005b. Final Environmental Impact Report, College Park at Mountain House, <br /> rllkSpecific Plan III, Volume III, SCH#2003102074, June 24. <br /> 4-46 <br />