Laserfiche WebLink
F111' <br /> ^+ MOUNTAIN HOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4.ENVIRONMENTAL CHECKLIST <br /> 4.16 UTILITIES AND SERVICE <br /> �l <br /> Less Than <br /> i Potential SPIIIEIR Significant <br /> { Significant Requires Impact Due New New <br /> Impact Additional to Mitigation Additional Additional <br /> Less Than Adequately Review:No Measures in Impact Not Mitigation <br /> Significant Addressed in Significant Project Addressed In Measures <br /> i Issue or No Impact SPIIIEIR Impact Description SPIIIEIR Required <br /> 1 16. UTILITIES AND SERVICE <br /> SYSTEMS. Would the project: <br /> a) Exceed wastewater treatment ■ ❑ <br /> requirements of the applicable <br /> Regional Water Quality Control <br /> Board? <br /> b) Require or result in the construction . ❑ ❑ ❑ <br /> of new water or wastewater <br /> treatment facilities or expansion of <br /> existing facilities,the construction <br /> of which could cause significant <br /> environmental effects? <br /> c) Require or result in the construction ■ ❑ ❑ ❑ ❑ <br /> of new storm water drainage <br /> 1 facilities or expansion of existing <br /> facilities,the construction of which <br /> could cause significant <br /> environmental effects? <br /> d) Have sufficient water supplies ■ <br /> 11 F1 <br /> available to serve the project from <br /> existing entitlements and resources, <br /> or are new or expanded entitlements <br /> needed? <br /> e) Result in a determination by the ■ ❑ ❑ <br /> wastewater treatment provider <br /> which serves or may serve the <br /> project that it has adequate capacity <br /> to serve the project's projected <br /> demand in addition to the provider's <br /> existing commitments? <br /> f) Be served by a landfill with ■ ❑ El ❑ El El <br /> sufficient permitted capacity to <br /> accommodate the project's solid <br /> waste disposal needs? <br /> g) Comply with federal,state,and local ■ F ❑ ❑ ❑ ❑ <br /> statutes and regulations related to <br /> solid waste? <br /> SETTING <br /> l <br /> The Mountain House Community Services District(MHCSD)provides water supply, <br /> wastewater disposal, and storm drainage for the Mountain House Community of which the <br /> s proposed Altamont Heights project is a part. Infrastructure for these utilities has been <br /> provided in the neighborhoods already occupied and currently under construction. The <br /> ? Altamont Heights project site would have to be annexed into the MHCSD before the <br /> ,i <br /> infrastructure could be extended to serve the proposed project. Water supply includes a raw <br /> water supply under a contract between the MHCSD and the Byron-Bethany Irrigation <br /> District, treatment at a plant owned and operated by the MHCSD, and distribution including <br /> booster pump stations,pipelines and storage tanks. The current maximum day capacity of <br /> 4-80 <br />