My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006254
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600364
>
SU0006254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 3:43:59 PM
Creation date
9/5/2019 10:46:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006254
PE
2691
FACILITY_NAME
PA-0600364
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600364\SU0006254\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1070
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
acres of wetland (General Plan, Volume I, Policy VI, G, 5; Master Plan, <br /> Implementation 7.3.6 (b)). <br /> d. The Wetland Plan shall be consistent with all Federal, State, and local <br /> regulations (Master Plan, Implementation 7.3.6 (k); Specific Plan III, <br /> Implementation Measure 7.3.4.3 (e)). <br /> e. The Wetland Plan shall show the location and extent of existing wetlands <br /> on the site of the proposed project. <br /> f. The Wetland Plan shall indicate sites that are to be developed or <br /> preserved to serve as mitigation for loss of wetlands as a result of the <br /> proposed project. To the extent practical, mitigation sites shall be in the <br /> Mountain House Creek corridor. If replacement in the Mountain House <br /> Creek corridor is not feasible, replacement shall be within San Joaquin <br /> County. <br /> g. Provisions shall be made for maintaining replacement wetland for a <br /> minimum of five (5) years. <br /> h. Assurance of wetland preservation shall be by conservation easement or <br /> other acceptable methods. <br /> In addition to the above,with regard to riparian habitat,the applicant will <br /> prepare a Riparian Habitat Mitigation Plan for the elimination of riparian habitat <br /> on the site, pursuant to Community Development Department Condition of <br /> Approval #38 for Major Subdivision Application PA-0600363. Riparian habitat <br /> generally does not include wetlands (see Section 9-110.4 of the San Joaquin <br /> County Development Title); however, to the extent that the elimination of any <br /> wetlands habitat on the site is compensated by the Riparian Habitat Mitigation <br /> Plan, the compensation provided by the Riparian Habitat Mitigation Plan would <br /> serve as mitigation for the loss of the wetlands. <br /> With respect to the Master Plan/ Specific Plan 111, the consistency review found <br /> that the proposed subdivision addresses the affordable housing objectives <br /> expressed in these plans by meeting Master Plan /Specific Plan III requirements <br /> for housing diversity and affordability, and density of development(within the <br /> Minimum and Maximum density range for the R/L and the RIM land use <br /> designations for Neighborhood A/B, per Master Plan Section 3.3. To meet Master <br /> Plan/Specific Plan III requirements regarding noise,future residents of the <br /> subdivision will be protected from excessive outdoor and indoor noise levels via <br /> _ landscaping, wall treatments, and construction requirements for homes. To <br /> promote greater energy efficiency and accessibility in accordance with Master <br /> Plan requirements, development of the subdivision incorporates a number of <br /> design features. <br /> With respect to the Public Financing Plan, the consistency review has determined <br /> the proposed subdivision is consistent with said plan because: 1)development <br /> of the subdivision will finance the pro-rata cost of infrastructure needed to serve <br /> it, through a combination of impact fees, monthly utility charges, special taxes <br /> and MHCSD special taxes; and 2) development of the subdivision will pay the <br /> cost of mitigating impacts on existing facilities, infrastructure and the <br /> environment. <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.