Laserfiche WebLink
i <br /> I <br /> MOUNTAIN 1-IOUSE PROPOSED ALTAMONT HEIGHTS TENTATIVE MAP 4. ENVIRONMENTAL CHECKLIST <br /> 4.6 GEOLOGY AND SOILS <br /> Less Than <br /> Potential SPIIIEIR Significant <br /> Significant Requires Impact Due New New <br /> Impact Additional to Mitigation .Additional Additional <br /> Less Than Adequately Review:No Measures in Impact Not Mitigation <br /> Significant Addressed in Significant Project' Addressed in Measures <br /> )CSStIe or No Impact SPIIIEIR. Impact Description SPIIIEIR Required <br /> 6. GEOLOGY AND SOILS. Would <br /> E <br /> the project: <br /> z <br /> a) Expose people or structures to <br /> potential substantial adverse effects, <br /> including the risk of loss,injury,or <br /> death involving: <br /> i) Rupture of a[crown earthquake ■ � � � ❑ ❑ <br /> fault,as delineated on the most <br /> recent AIquist-Priolo <br /> i' Earthquake Fault Zoning Map <br /> issued by the State Geologist <br /> for the area or based on other <br /> substantial evidence of a <br /> known fault? Refer to Division <br /> of Mines and Geology Special <br /> Publication 42. <br /> ii) Strong seismic ground ■ ❑ El 11 F1shaking? <br /> iii) Seismic-related ground failure, ■ ❑ Ll El ❑ ❑ <br /> including liquefaction? <br /> iv) Landslides? ■ ❑ ❑ ❑ ❑ ❑ <br /> b) Result in substantial soil erosion or ■ ❑ ❑ E 1 O <br /> s the loss of topsoil? <br /> t c) Be located on a geologic unit or soil ■ <br /> that is unstable,or that would <br /> become unstable as a result of the <br /> project,and potentially result in on- <br /> or off-site landslide,lateral <br /> spreading,subsidence,liquefaction <br /> or collapse? <br /> d) Be located on expansive soil,as ■ LJ defined in`fable 18-1-B of the <br /> Uniform Building Code(1994), <br /> creating substantial risks to life or <br /> property? <br /> i <br /> e) Have soils incapable of adequately S � El El <br /> supporting the use of septic tanks or <br /> alternative wastewater disposal <br /> systems where sewers are not <br /> available for the disposal of <br /> wastewater? <br /> 4-27 <br />