My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006254
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600364
>
SU0006254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 3:43:59 PM
Creation date
9/5/2019 10:46:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006254
PE
2691
FACILITY_NAME
PA-0600364
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600364\SU0006254\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1070
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> L MITIGATION MONITORING AND REPORTING PROGRAM <br /> LINTRODUCTION <br /> In accordance with the California Environmental Quality Act(CEQA), San Joaquin County(County)and <br /> Gerry N. Kamilos, LLC(GNK,LLC),prepared an environmental impact report(EIR)that identifies <br /> adverse impacts related to the College Park at Mountain House Specific Plan III Project.The EIR also <br /> identifies mitigation measures that would reduce or eliminate these impacts. <br /> L <br /> Section 21081.6 of the California Public Resources Code §I5091(d)and 15097 of the State CEQA <br /> L Guidelines require public agencies"to adopt a reporting and monitoring program for changes to the <br /> project which it has adopted or made a condition of project approval in order to mitigate or avoid <br /> significant effects on the environment."A Mitigation Monitoring and Reporting Program(MMRP)is <br /> required for the College Park at Mountain House Specific Plan III Project because the EIR for the project <br /> identified potentially significant adverse impacts related to construction and implementation activities, <br /> and mitigation measures have been identified to mitigate those impacts. <br /> Adoption of the MM"will occur along with approval of the proposed project. <br /> Ir <br /> PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> i. <br /> V This MMRP has been prepared to ensure that all required mitigation measures are implemented and <br /> completed according to schedule and maintained in a satisfactory mannerAuring the construction of the <br /> project,as required.The MMRP may be modified by San Joaquin County during project implementation, <br /> as necessary, in response to changing conditions or other refinements. A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> monitoring/mitigation timing,responsible person/agency for implementing the measure, monitoring and <br /> reporting procedure,and space to confirm implementation of the mitigation measures.The numbering of <br /> mitigation measures follows the numbering sequence found in the EIR. <br /> L ROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein,San Joaquin County is responsible for taking all actions necessary to <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> ` demonstrating that the action has been successfully completed. San Joaquin County, at its discretion,may <br /> delegate implementation responsibility or portions thereof to the developer(GNK,LLC), a licensed <br /> Lcontractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> County staff members, and/or the construction contractor has completed the necessary actions for each <br /> measure. San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period. Duties of the project manager include the following: <br /> L < Ensure that routine inspections of the construction site are conducted by appropriate San Joaquin <br /> County staff, check plans,reports,and other documents required by the MMRP; and conduct report <br /> activities. <br /> < Serve as a liaison between San Joaquin County, the Mountain House Community.Services District <br /> (MHCSD), and the construction contractor regarding mitigation monitoring issues. <br /> L < Complete forms and maintain reports and other records and documents generated by the MMRP. <br /> College Park at Mountain House Specific Plan III EDAW <br /> San Joaquin County 1 Mitigation Monitoring and Reporting Program <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.