Laserfiche WebLink
K0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> g Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Acton <br /> Completed <br /> CL <br /> 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> M Remains conjunction with the <br /> tD In accordance with the California Health and Safety developer,and in <br /> Code, if human remains are uncovered during conjunction with <br /> construction at the project site,the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed. <br /> SJCCDD. The County shall, in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> a 7050.5[b]). If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> determination(HSC Section 7050[c]).Once a Most <br /> Likely Descendent(MLD)has been designated by the <br /> m NAHC, the MLD, in consultation with the County, <br /> v shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> °= notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 5097.9. Measures likely resulting from the above <br /> could include preservation in place and <br /> x capping/avoidance,or removal and continued <br /> Nmonitoring of ground-disturbing activities. <br /> CD <br /> 0 c 4.7 DRAINAGE <br /> W 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD,in <br /> Capacity of the Storm-drain System conjunction with the <br /> ov The College Park developers shall expand WQB1 as developer <br /> m <br /> > > required to accommodate runoff from the College <br /> Park project,or shall provide the required on-site <br /> I I I I I I I I I I I I I I I I I I I <br />