Laserfiche WebLink
Km <br /> n o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> o^ Mitigation Measure Timing/Schedule Implementation Date <br /> �. Responsibility Action <br /> � Completed <br /> naction required" in the regulatory agency <br /> databases, and the facilities that are the source of <br /> oany contamination have been removed in <br /> accordance with applicable regulations. The <br /> c project developers may attempt to advance the <br /> above, if they desire,by conducting their own <br /> 0 <br /> investigations of these sites in coordination with <br /> 3 the property owners and regulatory agencies,and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation,or modification of - <br /> structures on the project site and off-site <br /> N infrastructure sites constructed before 1981 <br /> (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> n experts to survey these buildings for asbestos and <br /> 0 <br /> lead-based paint.Demolition, renovation, or <br /> M modification of any structures identified as <br /> m containing asbestos or lead-based paint shall be <br /> RL performed by a licensed asbestos and lead-based <br /> paint abatement contractor in accordance with <br /> oapplicable regulations. <br /> d 4.9-4 Public Health and Safety—Locate a School Site in During design phase SJCCDD, in <br /> an Area of Potential Hazards conjunction with the <br /> Cn o < The College Park developers shall have a developer and a <br /> preliminary Endangerment Assessment(PEA) qualified hazardous <br /> o` rn prepared by a qualified hazardous materials materials expert;in <br /> m consultant for the school located near the Lucky J consultation with CDE <br /> Dairy, if required by California Department of and DTSC <br /> o v Education(CDE).The PEA shall be prepared in <br /> > > accordance with CDE and Department of Toxic <br /> •� Substances Control(DTSC)requirements and <br /> I I I I I I I I I I ! I I I I I I <br />