Laserfiche WebLink
r r r r r r r r r r r r r r r r r r r <br /> � o <br /> wm College Park at Mountain House Specific Plan M <br /> d Mitigation Monitoring and Reporting Program <br /> s �- <br /> o °= Implementation&Verification <br /> c <br /> Mitigation Measure Implementation <br /> = 9 Timing/Schedule <br /> Responsibility Action Date <br /> Completed <br /> begins during the nesting season(April I–August <br /> 0 31),pre-construction surveys shall be conducted <br /> N during the nesting season in suitable nesting <br /> `D habitat within 100 feet of areas of project <br /> activity. The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction begins during <br /> the nesting season(April 1–August 31),pre- <br /> o' <br /> construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity. A <br /> o setback of 500 feet from California horned lark <br /> and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> n season for the period encompassing nest building <br /> m and continuing until fledglings leave nests. This <br /> o setback applies whenever construction or other <br /> �. ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> P <br /> o <br /> M <br /> are known to be occupied. Setbacks shall be <br /> n o marked by brightly colored temporary fencing. <br /> 4.10-9 Biological Resources—Conversion of San Joaquin Before construction SJCOG, in <br />