Laserfiche WebLink
r r__ r r r r _ r r r F r r- U- <br /> 0 <br /> 0 College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Date <br /> Action <br /> Completed <br /> below: <br /> 0 Special-Status Plants Before construction SJCOG, in <br /> < Before any ground-disturbing or vegetation- consultation with <br /> N clearing activities, a qualified botanist shall USFWS and DFG <br /> conduct surveys for the special-status plant <br /> species identified in Table 4.11-1 of the EIR. <br /> Surveys shall be conducted at the appropriate <br /> time, when the target species would be in flower <br /> and therefore clearly identifiable(i.e.,blooming <br /> period)and in all areas of suitable habitat that <br /> would potentially be disturbed.If no special- <br /> status plants are found,no further mitigation <br /> shall be required. <br /> If special-status plants are found and the <br /> populations can be avoided during project <br /> implementation,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> If special-status plant populations cannot be <br /> E5 avoided, consultations with DFG and/or <br /> USFWS may be required,depending on the <br /> listing status of the species present. These <br /> 0. consultations shall determine appropriate <br /> mitigation measures for any populations that <br /> would be affected by the implementation of <br /> o the proposed project.Appropriate measures <br /> m may include the creation of off-site <br /> populations through seed collection or <br /> transplanting,preservation and enhancement <br /> of existing populations, or restoration or <br /> $ m creation of suitable habitat in sufficient <br /> quantities to compensate for the impact. <br /> California Red-Legged Frog Before construction SJCOG,in <br />