Laserfiche WebLink
r— r_ �. F_ r— <br /> . moo <br /> mB College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule <br /> Implementation Implementation&Verification <br /> Responsibility Action Date <br /> uali.rred biolo ist and DFG determine it would Completed <br /> �• 4 g <br /> o not be likely,to adversely affect the nest. <br /> N Monitoring of the nest by a qualified biologist <br /> m may be required if the activity has potential <br /> Cn <br /> adversely affect the nest. <br /> San Joaquin Kit Fox Before construction SIC <br /> OG, in <br /> o < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a completed no more USFWS and DFG <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> or construction activity. The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas.Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> Standardized Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groan <br /> o Disturbance(USFWS 1999). <br /> � < If no active dens are found during the surveys, a <br /> 0 letter report documenting the survey methodology <br /> o and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> before the start of ground disturbance or <br /> a construction activity,and no further mitigation <br /> CD shall be necessary. <br /> < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> -9 determine its current use. If no activity is observe <br /> E; M during this period, the den shall be destroyed <br /> 3 immediately to preclude subsequent use. If kit fox <br /> activity is observed, the den shall be monitored for <br />