Laserfiche WebLink
MOUNTAIN HousE PROPOSED ALTAMONT HEIGF3Ts TENTATIVE MAP 4. ENV[RONMENTAI,CHECKLIST <br /> 4.9 LAND USE AND PLANNING, <br /> I <br /> I <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> b) Conflict with any applicable land use plan,policy, or regulation of an-agency.with <br /> jurisdiction over the project <br />� (inclu,.ding, <br /> but not lim.ited to the e <br /> neral plan, specific <br /> plan, local coastalprogam, or zoning'ordinance1adoPtedfor he urP'oseofavot <br /> d <br /> ing <br /> or mitigating an environmental effect? <br /> The applicant is proposing a total:of 53 single-family dwelling units ani'd six secondary unit's <br /> on 12,72 acres. This is consistent with the SPHI General Plan and Zoniing density for the <br /> property. The applicant is proposing to remove the riparian corridor, which is inconsistent <br /> with the General Plan and Zoning Ladd Use Maps and will require an amendment to these <br /> documents. <br /> The development plan is consistent with policies in Specific Plan III to create pedestrian <br /> walkways, as well as a mix of housing types to meet affordable housing goals. The proposed <br /> project and densities are within the scope of the SPIIIEIR and does not create any new <br /> impacts. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> e c) Conflict with any applicable habitat conservation plan or natural community <br /> !! conservation plan? <br /> The proposed project would not conflict with any adopted Habitat Conservation Plan,Natural <br />° Community Conservation Plan, or other approved conservation plan_ The San Joaquin <br /> County Multi-Species Habitat Conservation and Open Space Plan (SJMSCP) has been <br /> prepared to provide a strategy for balancing the need to conserve agricultural lands and <br /> wildlife habitat while accommodating a growing population in the County. The SJMSCP is <br /> designed to establish an assessment process for conversion of land to non-open space uses <br /> t when such conversion may affect the plant, fish, and wildlife species covered by the <br /> SJMSCP. <br /> Compliance with the SJMSCP will be met through the applicant's payment of the SJMSCP <br /> fee along with pre-construction surveys and "take" avoidance measures spelled out in the <br /> SJMSCP. <br /> 1 { The proposed project will comply with the requirements in the Riparian Habitat Ordinance. <br /> This ordinance requires a developer to protect existing riparian habitat(such as the drainage <br /> swale habitat at the proposed project site) or mitigate for the loss of the habitat. One method <br /> of mitigation is to contribute to existing off-site riparian habitat areas such as the Mountain <br /> House Creek corridor. Policies related to protection of other sensitive biological resources <br /> (such as special status species) will be addressed through the applicant's participation in the <br /> SJMSCP. <br /> 4-50 <br />